Consultation
Technical meeting to define the objective, area of interest, required accuracy and legal constraints. We provide a campaign plan, timeline and budget.
- AOI definition
- Accuracy requirements
- ANAC / AMN licensing
Method
A repeatable six-phase process, from scoping to continuous monitoring. Each phase has defined deliverables, documented quality control and a committed timeline.
Technical meeting to define the objective, area of interest, required accuracy and legal constraints. We provide a campaign plan, timeline and budget.
Definition of technical parameters and of the flight or geophysical survey lines, GNSS control network, tide windows, weather forecast, and risk analysis of the survey site. For drone flights, it includes the flight authorisation request to the Portuguese aeronautical authority (AAN).
Operation with UAV or USV fleet, or geophysical survey, quality control in the field, and upload of the information to a digital database.
Cloud pipeline with parallel processing: adjustment, filtering, model-assisted classification and validation by the responsible technician.
Geospatial deliverables in open formats, signed technical report, web portal for review and a carbon footprint balance for the campaign.
Periodic, comparable campaigns for change detection — erosion, siltation, volumes or asset integrity.
Technical FAQ
Can't find the answer? We'll send a technical opinion with no obligation.
Talk to a geophysicist →For areas up to 50 km², acquisition takes 2 to 5 days in the field. The technical report and final deliverables are made available within 72 hours of acquisition closing, with daily previews on the client portal.
Drone surveying with GNSS RTK support: ±0.02 m vertical and ±0.015 m horizontal. Multibeam bathymetry: compliant with IHO S‑44 Special Order, with typical vertical uncertainty below 0.05 m.
LAS/LAZ point clouds, GeoTIFF/COG orthophotomaps, raster DTM/DSM models, vectors in GeoPackage, Shapefile or PostGIS, and PDF reports. Reference system ETRS89/PT-TM06 or another of your choice.
Yes. We handle ANAC flight authorisations, coordination with the AMN in maritime environments, and disturbance-minimisation plans for Natura 2000 areas. Electric autonomous equipment reduces noise and emissions during acquisition.
We account for travel, vessel hours, cloud processing energy consumption and accommodation. The figure appears in the final report, compared against an equivalent conventional campaign.
Yes. We publish OGC services (WMS/WFS/WMTS), connect to existing PostGIS databases and set up web viewers or dashboards for non-technical teams.