Specialised service
Reservoir capacity assessment
Know how much water the reservoir still holds, after years of sediment.
- Methods used
- Bathymetry
- Sectors
- EnvironmentEngineeringWater
Typical turnaround:5 to 12 business daysAnswer within 48 working hours

What it solves
A reservoir's storage curve is usually the design one — and the design predates decades of sediment coming in. Whoever manages the water decides with that figure: how much can be guaranteed, how much can be released, when to cut supply. A bed survey gives the curve as it is today, level by level, and says how much storage has been lost since the beginning.
What it avoids
- Managing water with the design curve
- Guaranteeing volumes the reservoir no longer holds
- Discovering the lost capacity in a dry year
- Having no figure to justify dredging or sediment flushing
How it works
- 1
The reservoir and the level
The level on the day and the datum are fixed. A storage curve is a relationship between level and volume, and without a fixed reference it compares neither with the design nor with the next campaign.
- 2
Surveying the bed
Full-coverage multibeam wherever there is water to navigate, and the electric USV in the shallows and the tails — which is where sediment gathers most and where vessels cannot go.
- 3
Level–volume curve
The bed model gives volume by level — the curve as it stands today — and comparing it with the original curve gives the capacity lost, in volume and as a percentage.
- 4
Where the sediment is
Besides the total, you get the map of where the material settled: near the dam, in the tails, at the mouths of tributaries. That is what says where an intervention is worth it.
Worth knowing
The curve comes from what could actually be measured: shallow, weed-choked or inaccessible areas are interpolated, and that is stated along with the area they represent. The tails, where sediment gathers most, are the hardest place to measure.
What we survey, and in what detail
| Target | How it is found | Detail | What you receive |
|---|---|---|---|
| Level–volume curve as it stands today | Bed model integrated by level | The whole water column | Updated curve, as table and chart |
| Capacity lost since the beginning | Comparison with the design curve | The whole water column | Volume and percentage lost |
| Where the sediment settled | Multibeam, with the USV in the shallows | The whole water column | Map of accumulated thickness |
Swipe the table sideways to see the other columns.
What we need from you
- The design level–volume curve, or the most recent one available.
- The reservoir level on the day and the operating history.
- Access to the tails and the shallow areas.
- Clearance from the operator and the navigation rules on the reservoir.
What you receive
- Updated level–volume curve
- Map of sediment thickness
- Digital terrain model of the bed (0.25 m grid)
Equipment
- Norbit iWBMSh
- Applanix POS MV
- USV elétrica 4 m
Typical turnaround
5 to 12 business days
Answer within 48 working hours
Yes, in volume and as a percentage of the original curve, with a map of where the sediment sits. The percentage alone is not enough to decide an intervention.
That is where the electric USV works best: shallow water, no large propeller and nobody aboard. Where even it cannot go, the area is marked as not measured.
It depends on what the river brings. In heavily eroding catchments every few years makes sense; elsewhere one campaign a decade says what is needed.
Other specialised services
- Bathymetric survey
- Seabed mapping
- Siltation monitoring
- Dredging volume calculation
- Post-dredging control
- Navigation channel monitoring
- Dam and reservoir inspection
- River and canal survey
- Flood studies
- Erosion and sedimentation monitoring
- Submerged infrastructure inspection
- Pre- and post-works survey
- Submerged obstacle search
- Environmental monitoring
Want this survey on your site?
Tell us where it is and what you need to know. We answer with a campaign plan, a schedule and an estimate within 48 working hours.