GeoTrevo — geofísica, cartografia, SIG e batimetria
← Bathymetry

Specialised service

Navigation channel monitoring

Make sure the channel has the depth the ships need.

Methods used
Bathymetry
Sectors
Civil constructionPortsEngineering

Typical turnaround:5 to 12 business daysAnswer within 48 working hours

Autonomous survey vessel on the river, downstream of a weir

What it solves

A channel does not lose depth evenly: it silts on a bend, at a berth, at the mouth of a tributary — and one point is enough to compromise the draught of the whole approach. Periodic monitoring surveys the channel with full coverage, marks the critical points and says when maintenance dredging can no longer wait.

What it avoids

  • Draught restrictions discovered by a ship
  • Maintenance dredging decided late, and therefore dearer
  • Out-of-date working charts in circulation
  • An obstruction in the channel nobody knew was there

How it works

  1. 1

    The channel and the guaranteed depth

    The alignment, the usable width and the level that must be guaranteed are fixed. Everything else is read against that figure — without it you have a survey, not a control.

  2. 2

    Full coverage of the channel

    Multibeam along the channel, with overlap between passes and tidal correction. Side-scan comes along when what is lying on the bed matters too.

  3. 3

    Critical points

    On the model, the points where the guaranteed level is not met are marked, with the area and the missing thickness. That says whether the answer is dredge now, dredge in winter, or watch.

  4. 4

    Delivery and repetition

    Out comes the channel chart with the critical points and the comparison against the previous campaign. Repeated on a fixed cycle it becomes a series — and a series gets ahead of the problem.

Worth knowing

Depth is always read against a tidal datum, and a guaranteed level without one means nothing. In channels with heavy sediment transport, what complies today may not in a month: that is why the survey date appears on every drawing.

What we survey, and in what detail

TargetHow it is foundDetailWhat you receive
Channel depth, with full coverageMultibeam, tidally correctedThe whole water columnChannel chart and bed model
Points short of the guaranteed levelModel against the guaranteed levelFrom guaranteed level to the bedCritical points, with area and thickness
Obstructions lying on the bedSide-scan sonarThe bed surfaceTargets with position and apparent size
Change between campaignsDifference between modelsThe whole water columnDifference map and volume

Swipe the table sideways to see the other columns.

What we need from you

  • The channel alignment, the usable width and the guaranteed level.
  • Earlier surveys, with date and datum.
  • Traffic and the windows in which measuring will not stop operations.
  • The history of maintenance dredging and what usually gets dredged.

What you receive

  • Channel chart with the critical points
  • Digital terrain model of the bed (0.25 m grid)
  • IHO S‑44 conformity report

Equipment

  • Norbit iWBMSh
  • EdgeTech 4125 SSS
  • Applanix POS MV

Typical turnaround

5 to 12 business days

Answer within 48 working hours

Frequently asked questions

Still have a question?

Talk to sales →

Yes, with agreed windows and, in shallow or busy areas, with the USV. The survey does not require closing the channel.